U.S. 95, Idaho
From IHSDMDownload
User Information
Organization/Agency: Idaho Transportation Department
Basic Project Information
Project Name/Description: 3 projects including Smokey Bolder to Hazard Creek
Nature of the Project/Study: Realignment
Project Location: US 95, from Mile Post 171.9 to 176.6
Highway Length: 4.7 mi
Functional Classification: Arterial
Design Speed: Intend to make a consistent 45 mph, with the possibility of 55 mph if the consideration of a tunnel is approved
Posted Speed: Currently from 35 to 60 mph at different sections
Terrain Type: Mountainous
Application of IHSDM
IHSDM Module(s) used:
• Policy Review
• Crash Prediction
• Design Consistency
• Traffic Analysis
Purpose of using IHSDM on this project:
As a tool to help review the design plans
Stage(s) of the project development process in which IHSDM was applied (e.g., planning, preliminary design, final design, etc.):
Preliminary design
How IHSDM results were used to make design decisions:
- Policy Review Module: the results were compared with results from another Policy Checking tool to confirm that the design meets standards
- Crash Prediction Module: to identify problem spots, and also potential liabilities if the improvement cannot be carried out
- Design Consistency Module: to identify problem spots
- Traffic Analysis Module: to identify delays and passing bottlenecks