U.S. 95, Idaho

From IHSDMDownload

Jump to: navigation, search

User Information


Organization/Agency: Idaho Transportation Department


Basic Project Information


Project Name/Description: 3 projects including Smokey Bolder to Hazard Creek


Nature of the Project/Study: Realignment


Project Location: US 95, from Mile Post 171.9 to 176.6


Highway Length: 4.7 mi


Functional Classification: Arterial


Design Speed: Intend to make a consistent 45 mph, with the possibility of 55 mph if the consideration of a tunnel is approved


Posted Speed: Currently from 35 to 60 mph at different sections


Terrain Type: Mountainous


Application of IHSDM


IHSDM Module(s) used:


• Policy Review

• Crash Prediction

• Design Consistency

• Traffic Analysis


Purpose of using IHSDM on this project:


As a tool to help review the design plans


Stage(s) of the project development process in which IHSDM was applied (e.g., planning, preliminary design, final design, etc.):


Preliminary design


How IHSDM results were used to make design decisions:


  • Policy Review Module: the results were compared with results from another Policy Checking tool to confirm that the design meets standards
  • Crash Prediction Module: to identify problem spots, and also potential liabilities if the improvement cannot be carried out
  • Design Consistency Module: to identify problem spots
  • Traffic Analysis Module: to identify delays and passing bottlenecks
Personal tools